City Bus
Intercity Bus
Coach
Technical Data sheet
Technical Datasheet | PFS-IV | PFS-V | BFFS-05 | BFFS-06 |
Vehicle Length(m) | 7.9-8.1m | 8.1-9.2m | 9.2-11m | 10.5-12m |
Cooling Capactity(kcal/h) | 22000 | 24000 | 2800 | 3200 |
Evaporator Airflow(m³/h) | 4000 | 4000 | 6000 | 7000 |
Compressor | 2*TM-21 | 2*AK-33 | 2*AK-33/TM-31 | 2*AK-33/TM-31 |
Size(mm) | 3335*1820*187 | 3335*1820*187 | 3804*1902*210 | 4435*1902*210 |
Remark:copper structure optional BFFS |
Features
LFT-D structure
Ultralight, consistent, recyclable and rigid.
Thermal insulation materials
Environmentally friendly, antiseptic, odourless and flame-retardant(A-0).
Proven performance
Over 10,000 sets running globally since 2003.
Quiet
Through acoustic material and fan airflow optimization, noise level 2dB lower.
Powerful cooling
Through big margin deisgn, heating transfer surface increased 30%, heating efficiency improved 10%, cooling capacity increased 10%.
Patented CAN control
Modular design, digital communication; PWM control module, evaporator fan stepless speed regulation; smart condenser fan control, cooling on demand.
Installation
Preparation
First clean the rooftop surface, then put glue to install the sponge and rubber pad, later put glue with a glue gun around the sponge.
Evaporator and Condensor Installation
Lift the condensor and evaporator to the top of the bus, install and connect the pipes and wiring harness, then fix the condesor and evaporator to the bus rooftop, put glue for sealants where needed.
Cover Installation
Move the cover to the top of condensor and evaporator, check the position and drop the cover, fix screws and check the gap to follow requrements.
References
Africa References
Asia References
America References
Related Products
Inquiry
Please feel free to send us your inquiry, and we will give you a reply within 24 hours.